Inspecting a chiller system before moving from one of four staging areas to the assembly floor for final installation on a filter system.

Each staging area is dedicated to a specific filter system and provides a strategic location for parts.  This insures that all parts required for an order are ready and available when the assembly process is started.

Accurate tracking is guaranteed allowing “just in time” part and sub assembly movement through the shop.

Part of our mission at Barnes International is on time delivery of a quality product.

For additional information please call us at 815-964-8661 or visit our website at http://barnesintl.com